Mitsubishi Electronics QD75MH1 ユーザーズマニュアル

ページ / 838
 
 
 
11 - 14 
MELSEC-Q
 
11   MANUAL CONTROL 
 
  When both the "forward run JOG start signal" and "reverse run JOG start 
signal" are turned ON simultaneously for one axis 
 
When both the "forward run JOG start signal" and "reverse run JOG start signal" 
are turned ON simultaneously for one axis, the "forward run JOG start signal" is 
given priority. In this case, the "reverse run JOG start signal" is validated when the 
QD75MH BUSY signal is turned OFF.  
If the forward run JOG operation is stopped due to stop or axis error by a stop 
signal, the reverse run JOG operation will not be executed even if the "reverse run 
JOG start signal" turns ON. 
 
OFF
ON
OFF
ON
BUSY signal[XC, XD, XE, XF]
OFF
ON
Forward run JOG operation 
t
The reverse run JOG
start signal is ignored. 
Reverse run JOG operation 
Forward run JOG start signal
                     [Y8, YA, YC, YE]
Reverse run JOG start signal
                    [Y9, YB, YD, YF]
 
Fig. 11.8  Operation when both the forward run JOG start signal and reverse run JOG start signal are 
turned ON simultaneously