Toshiba MMU-AP0091H 仕様ガイド

ページ / 228
187
Part type
Exchange contents
Initial setup
at shipment
SW01 Rotary SW 4bit 16 step Display / Operation switch (1)
For 7-segment display / service operation
[1]
SW02 Rotary SW 4bit 16 step Display / Operation switch (2)
For 7-segment display / service operation
[1]
SW03 Rotary SW 4bit 16 step Display / Operation switch (3)
For 7-segment display / service operation
[1]
SW04 Push SW
For service [Operation/Start]
[Operation/Start] by pushing
SW05 Push SW
For service [Stop/End]
[Stop/End] by pushing
Bit 1     Backup setup
OFF
Bit 2
Bit 4
Bit 3
Bit 2
Bit 1
(Based on the following setup)
OFF
Bit 3
OFF
OFF
OFF
OFF
Normal
OFF
Bit 4
OFF
ON
No.1 COMP backup
OFF
SW06 SW 4bit
ON
OFF
No.2 COMP backup
Bit 1 Power peak-cut control exchange
OFF: 0 – 100%,  ON: Middle – 100%
OFF
Bit 2 Power peak-cut control exchange (Expansion) (For 4-steps exchange)
OFF
Bit 3
OFF
SW07 SW 4bit
Bit 4
OFF
n
 Header unit
Bit 1 Outdoor address setup exchange
OFF: Auto setup (Normal),    ON: Manual setup
OFF
Bit 2 Judge indoor capacity over
OFF: YES (Normal),    ON: NO
OFF
Bit 3 Correction of installed pipe size
OFF: Normal,    ON: Size UP
(For outdoor expansion)
OFF
SW09 SW 4bit
Bit 4 Judge abnormal No. of connected indoor units OFF: No error judgment,    ON: Error
OFF
Bit 1
OFF
Bit 2 Outdoor fan high-static pressure shift
OFF : Normal,    ON: High-static pressure shift
OFF
Bit 3
OFF: Normal,
ON : INV frequency upper limit restriction
OFF
SW10 SW 4bit
Bit 4
Sound reduction control
OFF: Normal,    ON: Fan rpm upper limit restriction
OFF
Bit 2
OFF
Bit 3
OFF
SW11 SW 4bit
Bit 4 Operation when indoor overflow detected
OFF: System stop,
ON : System operation continues
OFF
Bit 1 PMV manual operation selected
OFF: PMV1, PMV2
ON : PMV3
OFF
Bit 2
OFF
Bit 3
OFF
SW12 SW 4bit
Bit 4
OFF
Bit 1
OFF
Bit 2
OFF
Bit 3
OFF
SW13 SW 4bit
Bit 4 Line address setup
OFF
SW14 SW 4bit
Bit 1, 2, 3, 4
Line address setup
Refer to item “Address setup procedure”
OFF
SW30 SW 2bit
Bit 2 Terminator resistor between outdoor units
OFF: No Terminator resistor
ON : Exists
ON
CN30 Check connector
Manual full opening setup of PMV
Opened: Normal, Short: Opened fully
Open
CN31 Check connector
Manual full closing setup of PMV
Opened: Normal, Short: Opened fully
Open
CN32 Check connector
Check for assembly line in factory.
Opened: Normal, Short: Check mode
Open
10-2-1. Outdoor Interface P.C. Board
Dip switch function exchange setup list
* The outdoor unit connected with indoor/outdoor communication line becomes automatically the master unit.
No manual setting is necessary.