ユーザーズマニュアル目次Section 3 — OPERATION12Engineered GTS Transfer Switch12Control Console Components13Manual Transfer and Startup14Engine Governor Adjustments14SAFETY RULES2Retransfer and Shutdown15Section 1 — GENERAL INFORMATION4Automatic Operation15Generator4Weekly Exercise Cycle15Transfer Switch4Control Board DIP Switch Settings16Automatic System Operation4Section 4 — MAINTENANCE16Generator AC Connection Systems4Main Circuit Breaker5Service Facilities16Generator Fuel System5Exhaust Manifold Procedure17Engine Protective Devices5Intake Manifold Procedure17Unpacking6Cylinder Head Procedure17Lifting the Generator6Cooling System171.10 Specifications6Electrical System181.11 Fuel Consumption7Checking Fluid Levels181.12 Reconfiguring the Fuel System for LP Vapor71.13 Engine Oil Recommendations8Can Perform181.14 Coolant Recommendations8Miscellaneous Maintenance201.15 Before Installation84.10 Scheduled Maintenance21Section 2 — INSTALLATION8TROUBLESHOOTING24Standby Generator Installation8NOTES25Generator Location9ELECTRICAL DATA26Generator Mounting and Support9Basic Standby Electric System9PARTS LISTS34Emergency Circuit Isolation Method10Section 9 — INSTALLATION DIAGRAM51Total Circuit Isolation Method10Section 10 — WARRANTY52Grounding the Generator10Generator AC Neutral Connections10Using an Engineered “GTS” Transfer Switch102.10 Battery Installation112.11 Preparation Before Start-Up12Number of Main Bearings5No. of Teeth on Flywheel164サイズ: 5.42MBページ数: 56Language: Englishマニュアルを開く