ユーザーズマニュアル目次Chapter 1 Installation Preparations11.1 Project Files11.2 Tools and Instruments11.3 Installation Conditions11.3.1 Site Requirements11.3.2 Load-bearing Capacity Requirements11.3.3 Space Requirements11.3.4 Power Supply and Grounding Requirements11.3.5 Requirements for Transmission System11.3.6 Requirements for Antenna System11.4 Unpacking11.4.1 Unpacking Requirements11.4.2 Unpacking Wooden Case11.4.3 Unpacking Carton1Chapter 2 Installing Cabinet Base or Channel Steel22.1 Introduction to Cabinet Base22.1.1 Base for BTS3606A Cabinet22.1.2 Base for Battery Cabinet22.2 Installation Flowchart22.3 Installing Cabinet Base22.3.1 Laying Out Installation Position22.3.2 Casting Cement Plinth22.3.3 Positioning the Base22.3.4 Drilling Holes and Installing Expansion Bolts22.3.5 Fastening the Base22.4 Installing Channel Steel22.4.1 Laying out Installation Position22.4.2 Casting Cement Plinths22.4.3 Preparing Channel Steel22.4.4 Positioning Channel Steel22.4.5 Drilling Holes and Installing Expansion Bolts22.4.6 Fastening Channel Steel2Chapter 3 Installing Cabinet and Cabinet Equipment33.1 Installation of Cabinet33.1.1 Positioning Cabinet33.1.2 Leveling Cabinet33.1.3 Fastening Cabinet33.1.4 Installing Accessories33.1.5 Removing Lugs (Optional)33.2 Installation of Auxiliary Battery Cabinet33.2.1 Positioning Cabinet33.2.2 Leveling Cabinet33.2.3 Fastening Cabinet33.2.4 Installing Accessories33.2.5 Removing Lugs33.3 Installation and Removal of BTS3606A Cabinet Front Door33.3.1 Removing Front Door33.3.2 Removing Rear Door33.4 Installation of Cabinet Equipment33.4.1 Installing Boards in Baseband Subrack33.4.2 Installing Modules in RF Subrack33.4.3 Installing Power Module33.4.4 Installing Built-in Batteries33.4.5 Installing Built-in Transmission Equipment33.5 Installation or Removal of Auxiliary Battery Cabinet Doors33.5.1 Opening the Front Door33.5.2 Removing the Rear Door33.6 Installation of Batteries in Auxiliary Battery Cabinet33.7 Illustration of Cabinets After Installed on Cement Plinth3Chapter 4 Installing Outdoor Transmission and Power Interface Boxes44.1 Introduction to Outdoor Transmission and Power Interface Boxes44.1.1 Outdoor Transmission Interface Box44.1.2 Outdoor Power Interface Box44.2 Installing Outdoor Transmission and Power Interface Box44.2.1 Mounting Transmission Interface Box on the Wall44.2.2 Mounting Transmission Interface Box on the Steel Pole44.3 Using Internal Components of Transmission Interface Box44.3.1 Using 120Ω DDF Unit44.3.2 Using 75Ω DDF Unit44.3.3 Using Grounding Busbar44.3.4 Using 12-Core Fiber Fusing and Distributing Assemblies44.4 Installing Outdoor Power Input Components44.4.1 Installing Diesel Air Breaker Assemblies44.4.2 Installing Grounding Cable for Enclosure44.4.3 Installing Input Components of Single-phase Mains and Diesel44.4.4 Installing Single-phase Mains Input Components44.4.5 Installing Input Components of Three-phase Mains and Diesel44.4.6 Installing Three-phase Mains Input Components4Chapter 5 Installing Cables55.1 Types of Cables and Related Concepts55.1.1 Types of Cables for BTS3606A Deployment55.1.2 Related Concepts55.2 Cabling Diagram55.3 Installing RF Cables55.3.1 Connecting RF Jumper to Feeder55.3.2 Installing RF Cable Between CDDU/CHPA/CTRM (Single-Channel)55.3.3 Installing RF Cable Between CDDU/CMPA/CMTR (Multi-Channel)55.4 Installing E1/T1 Cables55.4.1 Planning Installation Position of E1/T1 Cables55.4.2 Installing Waterproof Components55.4.3 Shielding E1/T1 Cables55.4.4 Connecting E1/T1 Cables55.4.5 Connecting E1/T1 Trunks to Outdoor Transmission Interface Box55.5 Installing Optical Fibers55.5.1 Cabling Principles55.5.2 Installing Optical Fibers Cascading the ODU3601C55.6 Installing GPS Lightning Arrester and GPS Clock Cables55.7 Installing Power Cables55.7.1 Principles of Cabling Power Cables55.7.2 Making Power Cables55.7.3 Connecting Power Cables55.8 Installing Cabinet PGND Cables55.8.1 Making Cabinet PGND Cables55.8.2 Grounding Requirement55.8.3 Connecting PGND Cable of the Cabinet55.9 Installing Built-in Batteries55.10 Installing Cables of Battery Cabinet55.10.1 Introduction to Cables of Battery Cabinet55.10.2 Installing Internal Cables of the Battery Cabinet55.10.3 Installing External Cables of the Battery Cabinet55.10.4 Installing Cables between Battery Cabinet and BTS3606A Cabinet5Chapter 6 Checking Cabinet Installation66.1 Check Before Power-on66.1.1 Equipment Installation Check66.1.2 Cable Installation Check66.2 Power-on Check66.2.1 Power-on Check of Primary Power Supply66.2.2 Power-on Check of Power Modules66.2.3 Power-on Check of Air Conditioner66.2.4 Power-on Check of Integrated Equipment6Figure 1-1 Dimensions of cement base of BTS3606A single cabinet (unit: mm)1mm)1Figure 1-3 Straightening the tongues1Figure 1-4 Removing the cover1Figure 1-5 Removing all left wooden boards1Figure 1-6 Carton packed with boards1Figure 2-1 Outline and dimensions of the base for the BTS3606A cabinet2Figure 2-2 Outline and dimensions of the base for the battery cabinet2Figure 2-3 Installation flowchart2Figure 2-4 Installation position for a BTS3606A cabinet2Figure 2-5 Installation position for a battery cabinet2Figure 2-6 Dimensions of a cement plinth2Figure 2-7 Dimensions of cement plinth for battery cabinet and BTS3606A cabinet2Figure 2-8 Layout and dimensions of installation holes for a BTS3606A cabinet2Figure 2-9 Layout of installation holes when a battery cabinet is configured2Figure 2-10 Disassembling expansion bolts2Figure 2-11 Installing the expansion bolt and expansion tube2Figure 2-12 Fastening the base of BTS3606A2Figure 2-13 Fastening the base of battery cabinet2Figure 2-14 Preparing channel steel2Figure 3-1 Cabinet bearing points3Figure 3-2 Leveling a BTS3606A cabinet (Installing cabinet on base)3Figure 3-3 Leveling a BTS3606A cabinet (Installing cabinet on channel steel)3Figure 3-4 Opening the front door3Figure 3-5 Fixing the front door3Figure 3-6 Installing the burglary-resisting bolt3Figure 3-7 Mounting cabling rack3Figure 3-8 Mounting the rodent-resistant plate3Figure 3-9 Leveling a cabinet (battery cabinet)3Figure 3-10 Mounting the cabling rack3Figure 3-11 Mounting rodent-resistant plate3Figure 3-12 Installing a board (1)3Figure 3-13 Installing a board (2)3Figure 3-14 Installing a board (3)3Figure 3-15 Unlocking the rear door3Figure 3-16 Installing batteries3Figure 3-17 Removing baffle plates3Figure 3-18 BTS3606A cabinet installed on cement plinth3Figure 3-19 Auxiliary battery cabinet installed on cement plinth3Figure 4-1 Structure of 75Ω transmission interface box4Figure 4-2 Structure of 120Ω transmission interface box4Figure 4-3 Internal structure of PSI power interface box4Figure 4-4 Default configuration of PSI power interface box4Figure 4-5 Installation holes of expansion bolts4Figure 4-6 Mounting transmission interface box on the wall4Figure 4-7 Assembling the beam4Figure 4-8 Mounting transmission interface box on the steel pole4Figure 4-9 Cabling diagram after 120Ω DDF unit is installed (a)4Figure 4-10 Cabling diagram after 120Ω DDF unit is installed (b)4Figure 4-11 Cabling diagram after 75Ω DDF unit is installed4Figure 4-12 Grounding busbar4Figure 4-13 Structure of 12-core fiber fusing and distributing assemblies4Figure 4-15 Mounting diesel air breaker4Figure 4-16 Mounting air breaker interlock device4Figure 4-17 Operating air breaker interlock device4Figure 4-18 Installing grounding cable for enclosure4Figure 4-19 Input of single-phase mains and diesel4Figure 4-20 Input of single-phase mains4Figure 4-21 Input of three-phase mains and three-phase diesel4Figure 4-22 Input of three-phase mains4Figure 5-1 Front cabling diagram of the BTS3606A cabinet5Figure 5-2 Rear cabling diagram of the BTS3606A cabinet5Figure 5-3 Inlet/outlet of RF cables5Figure 5-4 Inlet/outlet panel after turnover5Figure 5-5 Installing RF cables5Figure 5-6 O(1) configuration5Figure 5-7 O(2) configuration5Figure 5-8 S(1/1/1) configuration5Figure 5-9 S(2/2/2) configuration5Figure 5-10 O(1) power synthesis5Figure 5-11 S(1/1/1) power synthesis5Figure 5-12 O(1) configuration5Figure 5-13 O(2) configuration5Figure 5-14 S(1/1/1) configuration5Figure 5-15 S(2/2/2) configuration5Figure 5-16 S(3/3/3) configuration5Figure 5-18 Distribution of waterproof components at the cabinet bottom5Figure 5-19 Routing E1/T1 cables5Figure 5-20 Sealing module5Figure 5-21 Stripping the core layer of the sealing module5Figure 5-22 Front view of common sealing module5Figure 5-23 Filler module5Figure 5-24 Fastening module5Figure 5-25 Lubricant5Figure 5-26 Removing the filling5Figure 5-27 Stripping the core layer5Figure 5-28 Daubing lubricant5Figure 5-29 Leading the cable5Figure 5-30 Installing the cable5Figure 5-31 Removing the shielding clip5Figure 5-32 Peeling off the outer skin of the E1 cable5Figure 5-33 Shielded E1/T1 cable5Figure 5-34 Connecting E1/T1 cables5Figure 5-35 Removing the front panel of the air intake box5Figure 5-36 Installing GPS lightning arrester (1)5Figure 5-37 Installing GPS lightning arrester (2)5Figure 5-38 Wrong and correct operations5Figure 5-39 Making lugs5Figure 5-40 Removing the cover of the power lightning protection filter5Figure 5-41 Installing the L1, L2, L3, and N lines5Figure 5-42 Installing short-circuit sheets (1)5Figure 5-43 Installing short-circuit sheets (2)5Figure 5-44 AC power lightning arrester used in the case of two-phase power supply5Figure 5-45 Connecting the 110 V power cables5Figure 5-46 PGND cable of the cabinet5Figure 5-47 Removing the cover the battery cabin5Figure 5-48 Pulling out the sliding plate5Figure 5-49 Placing and connecting two batteries5Figure 5-50 Pushing the batteries inside the cabin5Figure 5-51 Placing another two batteries5Figure 5-52 Connecting the rest cables5Figure 5-53 Access control and temperature sensor cable5Figure 5-54 Connecting cables in the extended battery cabinet5Figure 5-55 Connecting external cables of the battery cabinet5Figure 5-56 Connecting PGND cables of the battery cabinet5Figure 5-57 Outlets of the battery cabinet5Figure 5-58 Connecting cables of battery cabinet to DC lightning arrester5Figure 6-1 Front panel of the AC power distribution box6Table 1-1 Technical documents1Table 1-2 Tools and instruments1Table 4-1 Specifications of the TSI-DDF/ODF transmission interface box4Table 4-2 Specifications of the PSI power interface box4Table 5-1 Cables to be installed for deployment5Table 5-2 BTS3606A cable numbering scheme5Table 5-3 Typical configuration of a single cabinet5Table 5-4 Specifications of common sealing module5Table 5-5 Filler module specifications5Table 5-6 Cables and number of layers to be removed5Table 5-7 Cable diameters and number of layers to be removed5Table 5-8 Power cable specifications5Table 5-9 Description of cables in battery cabinet5Table 5-10 Connection of external cables of the storage battery5Table 6-1 Equipment installation checklist6Table 6-2 Cable installation checklist6Table 6-3 Measured values and corresponding operations6サイズ: 3.29MBページ数: 141Language: Englishマニュアルを開く