ユーザーズマニュアル目次About This Document3Contents71 Change History92 Installation Preparations102.1 Reference Documents112.2 Tools and Instruments112.3 Skills and Requirements for Onsite Personnel123 Information About the Installation133.1 RRU Exterior143.2 RRU Ports153.3 RRU Indicators163.4 Installation Options183.5 Installation Clearance Requirements of an RRU233.5.1 Clearance for a Single RRU233.5.2 Clearance for Multiple RRUs253.5.3 Spacing Between RRUs284 Unpacking the Equipment315 Installation Process336 Hoisting the RRU and Cables onto a Tower346.1 Hoisting an RRU onto a Tower356.2 Hoisting Fiber Optic Cables onto a Tower396.3 Hoisting Power Cables onto a Tower417 Installing the RRU457.1 Mounting Kits for an RRU467.2 Installing the RRU on a Pole467.2.1 Installing a Single RRU517.2.2 Installing Two RRUs547.2.3 Installing Multiple RRUs567.3 Installing the RRU on U-Steel617.4 Installing the RRU on Angle Steel657.5 Installing the RRU on a Wall688 Installing RRU Cables738.1 Cabling Requirements758.2 Cable Connections808.3 Installation Process838.4 RRU Cable List848.5 Installing an RRU PGND Cable868.6 Installing an RRU RF Jumper878.7 Installing an RRU Alarm Cable908.8 Installing an RRU AISG Multi-Wire Cable and an RRU AISG Extension Cable918.9 Opening the Cover Plate of an RRU Cabling Cavity948.10 Installing an RRU Power Cable968.11 Installing an Optical Fiber Cable978.12 Closing the Cover Plate of an RRU Cabling Cavity999 Checking the RRU Hardware Installation10210 Powering On an RRU10311 Appendix10511.1 Adding an Easy Power Receptacle (Pressfit Type) Connector to an RRU Power Cable106サイズ: 2.45MBページ数: 109Language: Englishマニュアルを開く