ユーザーズマニュアル目次About This Document3Contents71 Changes in the RRU3841 Installation92 Installation Preparations102.1 Reference Documents112.2 Tools and Instruments112.3 Skills and Requirements for Onsite Personnel123 Information About the Installation133.1 RRU Exterior143.2 RRU Ports143.3 RRU Indicators163.4 Installation Options183.5 Installation Clearance Requirements of an RRU223.5.1 Installation Clearance for a Single RRU233.5.2 Installation Clearance for Multiple RRUs243.5.3 Installation Spacing Between RRUs284 Unpacking the Equipment315 Installation Process336 Hoisting an RRU and Related Cables onto a Tower346.1 Hoisting an RRU onto a Tower356.2 Hoisting Fiber Optic Cables onto a Tower386.3 Hoisting Power Cables onto a Tower417 Installing the RRU437.1 Mounting Kits for an RRU447.2 Installing the RRU on a Pole447.2.1 Installing a Single RRU477.2.2 Installing Two RRUs497.2.3 Installing Multiple RRUs527.3 Installing the RRU on U-steel557.4 Installing the RRU on Angle Steel587.5 Installing the RRU on a Wall618 Installing RRU Cables668.1 Cabling Requirements688.2 Cable Connections738.3 Installation Process748.4 RRU Cable List758.5 Installing an RRU PGND Cable768.6 Installing an RRU RF Jumper788.7 Installing an RRU AISG Multi-Wire Cable and AISG Extension Cable808.8 Opening the Cover Plate of an RRU Cabling Cavity838.9 Installing an RRU power cable858.10 Installing a CPRI Fiber Optic Cable868.11 Installing an RRU Alarm Cable888.12 Closing the Cover Plate of an RRU Cabling Cavity899 Checking the RRU Hardware Installation9210 Powering On an RRU9311 Appendix9411.1 Adding an Tool-less Female Connector (Pressfit Type) to the RRU Power Cable on the RRU Side95サイズ: 2.81MBページ数: 98Language: Englishマニュアルを開く