ユーザーズマニュアル目次HAZARD DEFINITIONS2Termination and Fittings26PLEASE READ BEFORE PROCEEDING3Multiple Vent/Air Terminations26Room Air27RATINGS6System Water Piping Methods28Clearances7Provide Air Openings to Room8Chilled Water System28Flooring and Foundation8Freeze Protection28Vent and Air Piping8General Piping Information28Prevent Combustion Air Contamination8Circulator Sizing29Using an Existing Vent System to Install a New Boiler9Near Boiler Piping Components30Corrosive Contaminants and Sources9Removing a Boiler from Existing Common Vent10Connecting Gas Supply Piping35Remove Boiler from Wood Pallet11Natural Gas36Combustion and Ventilation Air Requirements12Pipe Sizing for Natural Gas36Natural Gas Supply Pressure Requirements36Direct Venting Options - Sidewall Vent14Propane Gas36Direct Venting Options - Vertical Vent14Pipe Sizing for Propane Gas36Direct Venting Options - Vert. Vent, Opt. Rm Air14Propane Supply Pressure Requirements36Direct Venting Options - Vert. Vent, Sidewall Air14Check Inlet Gas Supply37Install Vent and Combustion Air Piping15Gas Valve Replacement38Air Inlet Pipe Materials15Vent and Air Piping16Line Voltage Connections39Air Intake / Vent Connections16Low Voltage Connections40Min./Max. Combustion Air & Vent Piping Lengths17Wiring of the Cascade41Vent and Air Piping17Common Venting19Condensate Drain43PVC/CPVC199. STARTUP44Polypropylene21General53Vent/Air Termination - Vertical22Cascade56Determine Location22Sequence of Operation57Prepare Roof Penetrations22Home Screen58Termination and Fittings22Multiple Vent/Air Terminations23Maintenance & Annual Startup59Vent/Air Termination - Sidewall24Ladder Diagram64Determine Location24Wiring Diagram65Prepare Wall Penetrations26サイズ: 28.5MBページ数: 68Language: Englishマニュアルを開く