ユーザーズマニュアル目次Table of Contents4List of Figures11List of Tables14Foreword18FCC Requirements21General Safety23Revision History25Patent Notification26Chapter 1 Introduction27Optimization Manual: Scope and Layout28Purpose of the Optimization31Abbreviations and Acronyms33Required Test Equipment35Required Documentation41BTS Equipment Identification42BTS Frame Description48Frame Module Location & Identification50Sector Configuration57Chapter 2 Preliminary Operations63Chapter 3 Optimization/Calibration79Optimization/Calibration - Introduction80Isolate Span Lines/Connect LMF83Preparing the LMF85Using CDMA LMF95Download the BTS103CSM System Time/GPS and LFR/HSO Verification109Test Equipment Set-up121Test Set Calibration135Bay Level Offset Calibration146RFDS Set-up and Calibration160BTS Redundancy/Alarm Testing168BTS Alarms Testing179Preliminary Operations: Overview64Pre-Power-up Tests67Initial Power-up Tests75Chapter 4 Automated Acceptance Test Procedure187Automated Acceptance Test Procedures - All-inclusive TX & RX188TX Output Acceptance Tests: Introduction193TX Spectral Purity Transmit Mask Acceptance Test194TX Waveform Quality (rho) Acceptance Test196TX Pilot Time Offset Acceptance Test197TX Code Domain Power/Noise Floor Acceptance Test198RX Frame Error Rate (FER) Acceptance Test200Generate an ATP Report201Chapter 5 Prepare to Leave the Site203External Test Equipment Removal204Reset All Devices205Re-connect BTS T1 Spans and Integrated Frame Modem206BTS Site Span Configuration Verification207Set BTS Site Span Configuration208Updating CBSC LMF Files210LMF Removal211Re-establish OMC-R Control/ Verifying T1/E1212Chapter 6 Basic Troubleshooting213Basic Troubleshooting Overview214Troubleshooting: Installation215Troubleshooting: Download217Troubleshooting: Calibration219Troubleshooting: Transmit ATP221Troubleshooting: Receive ATP223Troubleshooting: CSM Check-list224C-CCP Backplane Troubleshooting226Module Front Panel LED Indicators and Connectors233Basic Troubleshooting - Span Control Link241Appendix A Data Sheets249Optimization (Pre-ATP) Data Sheets250Site Serial Number Check List267Appendix B PN Offset/I & Q Offset Register Programming Information269Appendix C FRU Optimization/ATP Test Matrix283Appendix D BBX Gain Set Point vs. BTS Output289Appendix E CDMA Operating Frequency293Appendix F PCS Interface Setup for Manual Testing301Purpose302Equipment Warm up302Prerequisites302HP8921A System Connectivity Test303Manual Cable Calibration using HP8921 with HP PCS Interface (HP83236)304HP PCS Interface Test Equipment Setup for Manual Testing308Calibrating Test Cable Setup using Advantest R3465309Appendix G VSWR313Appendix H Download ROM Code321Appendix I In-Service Calibration325Introduction326Power Delta Calibration327In-Service Calibration337Appendix J GPIB Addresses343Introduction344HP437 Power Meter GPIB Address344Gigatronics 8541C Power Meter GPIB Address345Motorola CyberTest GPIB Address346HP8935 Test Set GPIB Address347Setting HP8921A and HP83236A/B GPIB Address348Advantest R3465 GPIB Address350RS232 GPIB Interface Box351Advantest R3267 Spectrum Analyzer GPIB Address352Agilent E4406A Transmitter Tester GPIB Address354Index357サイズ: 3.61MBページ数: 366Language: Englishマニュアルを開く