ユーザーズマニュアル目次Method of Analysis5Sensitivity6Stability6Special Consideration6Physical Configuration62.1 Location72.2 Electrical Requirements & Connections72.2.1 Primary Power82.2.2 Signal Output82.2.3 Regulating Transformer82.2.4 Completion & Inspection92.3 Gas Requirements & Connections92.3.1 Reference Gas102.3.2 Zero Gas102.3.3 Span Gas102.3.4 Installation of Cylinder Supplies112.3.5 Sample Pressure112.3.6 Interconnecting Lines112.3.7 Vent Lines12Preliminary12Reference Gas Flow13Zero Gas Flow13Warmup13Zero Standardization13Span Standardization14Bypass14Sample Mode154.1 Flowrate154.2 Supporting Gas Supplies164.3 Standardization165.1 Heater Fan176.1 Preliminary176.1.1 Electrical Checks176.1.2 Sampling System Checks186.1.3 Summary of Preliminary Checks186.2 Loss of Zero Control186.2.1 Dynamic Balance Procedure196.3 Correct Operation206.4 Incorrect Operation216.4.1 Analyzer Leak Check216.4.2 Temperature Control Check22Ranges24Output Signal25Span Setting25Recommended Accessory Gases257.4.1 Reference Gas257.4.2 Zero Gas257.4.3 Span Gas26Recommended 2-Year Spare Parts List26Drawing List27Specifications28サイズ: 73.9KBページ数: 28Language: Englishマニュアルを開く