Peerless Industries SA771PU 사용자 설명서

다운로드
페이지 70
16 of 70
ISSUED: 10-30-09   SHEET #: 095-9299-11  03-22-12
K
J
F
A
G
CABLE
DETAIL 3
SLOT
WALL PLATE RAILS
Cable Management
NOTE: Make sure cables have enough slack to 
allow full movement of the arm.
Run power cable through top or bottom of arm (A)
and signal cable(s) through other side of arm in 
order to avoid interference with the signal. Lock 
cables into place by snapping cable covers (J & 
K
) onto mount as shown. Display may have to be 
moved for easy access.
Optional: If additional cable management is 
required route cable ties (G) through slots of arm (A)
as shown in detail 3. 
8
Snap wall plate covers (F) to top and bottom of wall 
plate rails as shown.
9