Peerless Industries DS-VW660 사용자 설명서

다운로드
페이지 10
5 of 10
ISSUED: 01-05-10   SHEET #: 125-9128-1 06-28-10
E
Installation to Wall Stud
 
Use a stud finder to locate the edges of the stud. Use of an edge-to-edge stud finder is highly recommended.
Based on their edges, draw a vertical line down the stud center. Place wall plate (
B) on wall as a template. Level
plate, and mark the center of the four mounting holes. Make sure that the mounting holes are on the stud center 
line. Drill four 5/32" (4 mm) dia. holes 2-1/2" (65 mm) deep. Make sure that the wall plate (
B) is level, secure it
using four #14 x 2.5" wood screws (
E) as shown below.
•  Installer must verify that the supporting surface will safely support the combined load of the equipment and all
attached hardware and components.
•  Tighten wood screws so
that wall plate is firmly attac
hed, but do not overtighten. Overtightening can damage the
screws, greatly reducing their holding power.
•  Never tighten in excess of 80 in. • lb (9 N.M.).
•  Make sure that mounting screws are anchored into the center of the stud. The use of an "edge to edge" stud finder
is highly recommended.
•  Hardware provided is for attachment of mount through standard thickness drywall or plaster into wood studs.  
Installers are responsible to provide hardware for other types of mounting situations.
WARNING
1
B
STUD