UDC 3300 Controller Product Manual
4/00
Table 6-2
Prompt Hierarchy and Available Selections
Prompt
(Lower
Display)
Definition
Value or Selection (use
▲
or
▼
)
(Upper Display)
SP RAMP
Setpoint Ramp Selection
Selections:
DISABL
SP RAMP must be disabled to allow
Setpoint Programming.
Setpoint Programming.
SP RATE
Setpoint Rate of Change
Selections:
DISABL
SP RATE must be disabled to allow
Setpoint Programming.
Setpoint Programming.
SP PROG
Setpoint Ramp/Soak
Programmer
Programmer
Selections:
DISABL
ENABLE—Loop 1
ENABL2—Loop 2
ENAB12—Loops 1 and 2
SP PROG must be enabled to view
the remaining prompts.
DISABL
ENABLE—Loop 1
ENABL2—Loop 2
ENAB12—Loops 1 and 2
SP PROG must be enabled to view
the remaining prompts.
STRT SEG
Start Segment Number
Enter Value:
1 to 11
END SEG
End Segment Number
Enter Value:
2 to 12
Always end in a soak Segment
(2,4,.....12)
(2,4,.....12)
RAMPUNIT
Engineering Units from
Ramp Segments
Ramp Segments
Selections:
TIME
EU/MIN
EU/HR
EU/MIN
EU/HR
RECYCLES
Number of Program
Recycles
Recycles
Enter Value:
0 to 99 recycles
SOAK DEV
Guaranteed Soak Deviation
Value
Value
Enter Value:
0 to +99.00
The number selected will be
0 to 99 ± from setpoint.
0 to 99 ± from setpoint.
PROG END
Program Termination State
Selections:
LASTSP—Hold at
last setpoint in the
program
F SAFE—Manual
mode/Failsafe
output
last setpoint in the
program
F SAFE—Manual
mode/Failsafe
output
STATE
Program State at Program
End
End
Selections:
DISABL
HOLD (hold mode)
HOLD (hold mode)
KEYRESET
Reset/rerun SP Program
Selections:
DISABL
RERUN
TOBEGN
RERUN
TOBEGN
HOTSTART
PV Hot Start
Program Initialization or
power up in SPP
Program Initialization or
power up in SPP
Selections:
DISABL—LSP1 is
used as the initial
ramp setpoint.
ENABL—PV value is
used as the initial
ramp setpoint.
used as the initial
ramp setpoint.
ENABL—PV value is
used as the initial
ramp setpoint.
SEG1RAMP
or
SEG1RATE
Segment #1 Ramp Time
or
Segment #1 Ramp Rate
or
Segment #1 Ramp Rate
Enter Value:
Ramp Time = 0-99hr.0-59min, or
Ramp Rate = Engineering units/min
Ramp Time = 0-99hr.0-59min, or
Ramp Rate = Engineering units/min
or Engineering units/hr
Select TIME, EU/MIN, or EU/HR at
prompt “RAMP UNIT”. All ramps will
use the same selection.
prompt “RAMP UNIT”. All ramps will
use the same selection.