SECTION 23—LEAK TEST
76
SECTION 23—LEAK TEST
 DANGER
To prevent electrical shock, ALWAYS disconnect concentrator from electrical outlet 
before servicing.
Leak Test
NOTE: For this procedure, refer to FIGURE 23.1 on page 77.
1. Unplug unit.
3. Plug in unit.
4. Turn the concentrator on ( ).
5. Let concentrator run for 20 minutes.
 WARNING
Apply small amount of leak test solution to fittings only. Avoid all other components. DO 
NOT leak test 4‐way valve body. Carefully leak test for pressure leaks around sieve bed 
hoses at 4‐way valve. DO NOT allow leak test solution to enter into 4‐way valve and 
system.
6. With ʺleak‐test” solution or equivalent soapy water, leak test the following:
A. The two sieve bed hose connection at the 4‐way valve/manifold assembly 
(Detail”A”).
B. Leak test the hose fitting on center port of 4‐way valve/manifold assembly.
C. Hose connections to top and bottom fittings of sieve beds.
D. P.E. valve hose connections.
E. Hose fittings at product tank cap and check valves (Detail “B”).
F. Both fittings on heat exchanger assembly (Detail “C”).
7. Replace any tubing that appears cracked, worn, etc.
9. Refer to Typical Product Parameters on page 8 for concentration levels. If low 
concentrations are observed, refer to Troubleshooting on page 16.