Avaya 03-300430 사용자 설명서

다운로드
페이지 2574
Communication Manager Maintenance-Object Repair Procedures
1456 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
System Technician-Demanded Tests: 
Descriptions and Error Codes
Investigate tests in the order presented. By clearing error codes associated with the NPE 
Crosstalk test (#6), you may also clear errors generated from other tests in the sequence.
NPE Crosstalk Test (#6)
The NPE Crosstalk Test verifies that this port’s NPE channel talks on the selected time slot and 
never crosses over to time slots reserved for other connections. If the NPE is not working 
correctly, 1-way and noisy connections may be observed. This test is usually only part of a 
port’s long test sequence and takes about 20 to 30 seconds to complete.
Note:
Note:
S8300
 / 
G700
On the G700/G350, this test aborts with Error Code 1412.
Note:
Note:
The TN464C or higher suffix UDS1 circuit pack has one SCOTCH-NPE chip 
instead of several NPE chips.
Table 523: System Technician-Demanded Tests: DS1-BD
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
1. D = Destructive, ND = Nondestructive
NPE Crosstalk test (#6)
S8300
 / 
G700
 On the G700/G350, aborts with Error Code 1412.
X
ND
Conference Circuit test (#7)
S8300
 / 
G700
 On the G700/G350, aborts with Error Code 1412.
X
ND
Audit and Update test (#36)
X
X
ND
Signaling Link State Check test (#255)
X
X
ND
Service State Audit test (#256)
X
X
ND
Call State Audit test (#257)
X
X
ND
ISDN Test Call test (#258)
S8300
 / 
G700
On the G700/G350, aborts with Error Code 1412.
X
ND