Goodman Mfg CVM96 사용자 설명서

다운로드
페이지 60
35
600
800
1000
1200
1400
1600
2000
0603__XA
---
---
564*
564*
672
768
0805__XA
---
---
---
752*
752*
768
960
1005__XA
1155__XA
---
---
---
940*
940*
940*
960
600
800
1000
1200
1400
1600
2000
0604__XA
---
---
641*
641*
672
768
---
0805__XA
1005__XA
---
---
---
854*
854*
854*
960
In
p
u
t
Ai
rf
lo
w
UPFLOW
COOLING AIRFLOW REQUIREMENT (CFM)
COUNTERFLOW
COOLING AIRFLOW REQUIREMENT (CFM)
In
p
u
t
Ai
rf
lo
w
*Minimum filter area dictated by heating airflow requirement.
Disposable Minimum Filter area (sq. in)
[Based on 300 ft/min filter face velocity]
U
PRIGHT
 I
NSTALLATIONS
Depending on the installation and/or customer preference, differ-
ing filter arrangements can be applied.  Filters can be installed in
the central return register or a side panel external filter rack kit
(upflows).  As an alternative a media air filter or electronic air cleaner
can be used as the requested filter.
The following figure shows possible filter locations.
FIL
T
E
R
AIR FLOW
CENTRAL
RETURN
GRILLE
FI
L
T
E
R
SIDE RETURN
EXTERNAL FILTER
RACK KIT
(EITHER SIDE)
Possible Upright Upflow
  
FIL
TER
AIR FLOW
CENTRAL
RETURN
GRILLE
RETURN
DUCT
FI
LT
E
R
FILTER
SUPPORT
BRACKET
(Field Supplied)
FILTER
ACCESS
DOOR
Possible Upright Counterflow
Filter Locations
H
ORIZONTAL
 I
NSTALLATIONS
Filters must be installed in either the central return register or in
the return air duct work.
S
TARTUP
 P
ROCEDURE
 & A
DJUSTMENT
Furnace must have a 115 VAC power supply properly connected
and grounded.  Proper polarity must be maintained for correct
operation.  In addition to the following start-up and adjustment
items, refer to further information in Operational Checks section.
MIN.
57%
78%
(80%)
100%
IGNITION
UNIT CALL FOR HEAT ENDS
10 MINS.
8 MINS.
2 MINS.
Operation with Conventional 1-Stage Thermostat
(DIP switch selections 1-Stage heat)
Call for heat, thermostat energizes W1 on IFC (W2 input is
ignored).
After a successful Light Off Sequence and expiration of the
Ignition Stabilization Period: