Goodman Mfg MVM96 사용자 설명서

다운로드
페이지 60
19
1
2
3
4
5
6
7
8
2 or 2 1/2
49
46
43
40
37
34
31
28
3
71
68
65
62
59
56
53
50
2 or 2 1/2
36
33
30
27
24
21
18
15
3
57
54
51
48
45
42
39
36
2 or 2 1/2
61
58
55
52
49
46
43
40
3
71
68
65
62
59
56
53
50
2 or 2 1/2
48
45
42
39
36
33
30
27
3
57
54
51
48
45
42
39
36
Standard
3
71
68
65
62
59
56
53
50
Alternate
3
57
54
51
48
45
42
39
36
*Maximum allowable limits listed are individual lengths for inlet & flue and NOT a combination.
80,000
Standard
Alternate
60,000
Standard
Alternate
Unit Input
(Btu)
Termination
Style
Pipe
(4)
(inch)
Number of Elbows 
(1)(2)(3)(5)
COUNTERFLOW
Direct Vent (Dual Pipe) Maximum Allowable Length*
of Vent/Flue & Combustion Air Intake Pipe
 (ft)
100,000
1) Elbows and/or tees used in terminations must be included when determin-
ing quantity of allowable elbows in the system.
2) Number of elbows tabulated are for each (Vent/Flue & Combustion Air
Intake) pipe.
3) Minimum requirements for each Vent/Flue & Combustion Air Intake pipe is
five (5) feet in length and one elbow/tee.
4) 2 1/2” or 3” diameter pipe can be used in place of 2” diameter pipe.
5) Increased Clearance Configurations using (2) 45 deg.  Long Sweep el-
bows should be considered equivalent to one 90 deg. elbow.
Vertical pipe terminations should be as shown in the following
figure.  Refer to Vent/Flue Pipe and Combustion Pipe - Termina-
tion Locations
 for details concerning location restrictions.  The
penetrations through the roof must be sealed tight with proper
flashing such as is used with a plastic plumbing vent.
SCREEN
(OPTIONAL)
12" MIN. TO ROOF
OR HIGHEST ANTICIPATED
 SNOW LEVEL
12" MIN.
VENT/FLUE
_____________________________________
VENT/FLUE
COMBUSTION
AIR INTAKE
SCREEN
(OPTIONAL)
12" MIN. TO ROOF
OR HIGHEST ANTICIPATED
 SNOW LEVEL
12" MIN.
TEE (OPTIONAL)
Vertical Terminations (Dual Pipe)
Horizontal terminations should be as shown in the following figure.
Refer to Vent/Flue Pipe and Combustion Pipe - Termination Loca-
tion
 for location restrictions. A 2 3/8” diameter  wall penetration is
required for 2” diameter pipe.  A 3” diameter hole is required for a 2
1/2” pipe and a  3 1/2” diameter hole is required for 3” diameter
pipe.   To secure the pipe passing through the wall and prohibit
damage to piping connections, a coupling should be installed on
either side of the wall and solvent cemented to a pipe connecting
the two couplings.  The pipe length  should be the wall thickness
plus the depth of the socket fittings to be installed on the inside
and outside of the wall.  The wall penetration should be sealed with
silicone caulking material.
90º OR 45°
MEDIUM RADIUS
ELBOW
3" MIN
24" MAX
SCREEN
(OPTIONAL)
12" MIN. TO ROOF OR
HIGHEST ANTICIPATED
 SNOW LEVEL
12" MIN. TO ROOF OR
HIGHEST ANTICIPATED
 SNOW LEVEL
12" MIN
3" MIN
24" MAX
Standard Horizontal Terminations (Dual Pipe)
_____________________________________
24" MAX
3" MIN
SCREEN
(OPTIONAL)
24" MAX
    AIR
INTAKE
     90°
MEDIUM 
RADIUS
ELBOW
     12" MIN. ABOVE
HIGHEST ANTICIPATED
 SNOW LEVEL
Alternate Horizontal Vent Termination (Dual Pipe)