Regency P40-NG1 사용자 설명서

다운로드
페이지 56
Regency
®
 P40-1 Direct Vent Gas Fireplace
10
INST
ALLA
TION
INSTALLATION
13” Mantel
8” Mantel
1” Mantel
33”
to floor
2
0
12
14
6
4
8
10
17”
21”
2
0
12
6
16
18
20
4
14
8
10
Combustible Material
Top Standoff
Non-Combustible
Header
(On Edge)
Side View
Top
Louvers
12”
8-1/2”
10-1/4”
Top
Nailing
Strip
Non-Combustible
Material
Full Screen Doors
MANTEL CLEARANCES
Because of the extreme heat this fi replace emits, the mantel clearances are critical. Combustible mantel clearances from top of louver 
opening are shown in the diagram below.  Mantel may be installed anywhere in the shaded area.
Note:  A non-combustible mantel may be installed at a lower height if the framing is made of metal studs covered with a non-combustible 
board.
Note:  Ensure that any paint  
used on the mantel or 
on  the facing is "heat 
resistant" or the paint may 
discolour.
7-1/4”
2”
Mantel
leg
Mantel
leg
P40
Fireplace
Allowable mantel leg
projection.
6”
1-1/2"
Maximum 
1-1/2" projection at 2" 
minimum clearance.
MANTEL LEG CLEARANCES
Combustible mantel leg clearances as per diagram:
7-1/4”
2”
Mantel
leg
Mantel
leg
Allowable mantel leg
projection.
6”
1-1/2"
P40
Fireplace
6”
Non Combustible Facing
2”
Full Screen Door
Maximum 
1-1/2" projection at 2" 
minimum clearance.
Mantel Leg Clearances - Full Screen Door
Mantel Leg Clearances - Flush Front