Quadra-Fire CASTINS-CSB 사용자 설명서

다운로드
페이지 52
R
August 20, 2009
250-7251G
Page  11
Castile Pellet Insert
Mark area of
floor to cut
Starter hole
Use 2 x 4 from insert
packaging to support insert
Keep sharp edge of
metal floor away from
power cord
F.  Removing Metal Floor of Factory-Built Firebox
• 
The fi rebrick (refractory), glass doors, screen rails, screen 
mesh and log grates can be removed from a factory-built 
fi rebox  in  order  to  gain  minimum  insert  opening  require-
ments.
• 
Any smoke shelves, shields and baffl es may be removed 
from a factory-built fi rebox if attached with mechanical fas-
teners.
• 
The metal fl oor of the factory-built fi rebox may be removed 
to  facilitate  the  installation  of  the  insert  only  when  a  1/4 
(6mm)  inch  airspace  is  provided  between  the  insert  and 
the fl oor of outer wrap.
Figure  11.1.  Measure  and  mark  the  metal 
fl oor for cutting.  With a drill, make a starter 
hole in each corner.
Figure  11.2.    Using  a  saws-all,  cut  out  the 
fl oor
Figure 11.3.   If the fl oor is made of thin metal, 
we recommend using the 2 x 4 from the insert 
packaging  to  support  the  insert.    The  2  x  4 
may need to be cut to the appropriate size.
Figure  11.4.    Place  the  insert  into  the  fac-
tory-built  fi rebox.    Ensure  that  the  power 
cord can not be damaged by the sharp metal 
edge.   You  may  need  to  cut  out  a  notch  to 
accommodate the cord.
The following is only one example as there are many dif-
ferent models of factory-built fi replaces.
NOTE: Ensure that the leveling leg is posi-
tioned  over  the  2  x  4  before  leveling  the 
insert.  See page 18, for detailed instructions 
on how to adjust the leveling legs.