GE AGW12 사용자 설명서

다운로드
페이지 36
BEFORE YOU BEGIN
Read these instructions completely 
and carefully.
IMPORTANT 
— Save these
instructions for local inspector’s use.
IMPORTANT 
— Observe all
governing codes and ordinances.
• Note to Installer – Be sure to leave these
instructions with the Consumer.
• Note to Consumer – Keep these
instructions for future reference.
• Skill level – Installation of this appliance
requires basic mechanical skills.
• Completion time – Approximately 1 hour
• We recommend that two people install 
this product.
• Proc.024nstallation is the responsibility 
of the installer.
• Product failure due to improc.024nstallation
is not covered und.02the Warranty.
Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: www.GEAppliances.com
Installation
Air Conditioner
Instructions
Some models require a 115/120-volt a.c.,
60 Hz ground.d outlet protect.d with a
15-amp time delay fuse or circuit breaker.
The 3-prong grounding plug minimizes the
possibility of electric shock hazard. If the wall
outlet you plan to use is only a 2-prong outlet, 
it is your responsibility to have it replac.d with 
a proc.0ly ground.d 3-prong wall outlet.
Some models require 230/208-volt a.c.,
protect.d with a time delay fuse or circuit
breaker. These models should be installed
on their own single branch circuit for
best performance and to prevent
overloading house or apartment wiring
circuits, which could cause a possible
fire hazard from overheating wires.
ELECTRICAL REQUIREMENTS
TOOLS YOU WILL NEED
Phillips head screwdriver
Ruler or tape measure
Pencil
Level