Safe lighting and other performance criteria were met with 
the gas manifold and control assembly provided on the 
boiler when the boiler underwent tests specifi ed in ANSI 
Z21.13.
INSPECT INSTALLATION BEFORE 
STARTING.
 INITIAL 
START
a.  FILL ENTIRE HEATING SYSTEM WITH 
WATER and vent air from system.  Vent air from 
all  heat distributing units and all high points in the 
piping of the system.  When venting air from system 
keep fi ll valve in open position to maintain water 
pressure.  Make certain pressure reducing valve is 
installed between the fi ll valve and the boiler. (See 
Figure 7)
      Use the following procedure on a series loop system 
equipped with zone valves.
1.  Close all but one zone valve.
2.  Attach a hose to drain valve on purge fi tting and 
extend hose to drain.
3.  Open drain valve on purge fi tting.
4.  Close purge valve.
5.  Open relief valve on boiler.
6. Open fi ll valve.
7.  When water discharges from relief valve, release 
the lever on top of the relief valve, allowing it to 
close.
8.  Allow water to run out of drain valve until zone 
has been purged of air and fi lled with water.
9.  Open zone valve to the second zone to be 
purged, then close the fi rst.  Repeat this step until 
all zones have been purged but always have one 
zone open.  At completion open all zone valves.
10. Close drain valve on purge fi tting.
11. Continue  fi lling the system until the pressure 
gauge reads 12 psi.  Close fi ll valve.
 
NOTE:  If make-up water line is equipped 
with pressure reducing valve, system will     
automatically fi ll to the set pressure of valve 
(normally 12 psi).  Leave globe valve open.
12. Open purge valve.
b. Set ROOM THERMOSTAT below room 
temperature.
III.  Operating Instructions
c.  Be sure that gas to pilot and main burners has been 
off for at least fi ve minutes.
d.  Open valve on main gas line at meter.
e.  PURGE AIR FROM GAS PIPING.  During the 
purge adequate ventilation must be provided and no 
smoking or open fl ame permitted. (See Figure 10)
1.  Open manual shutoff valve upstream of 
combination gas valve.
2.  Loosen or remove inlet pressure tap plug in 
combination gas valve and when purging is 
complete, tighten or replace plug.
3.  Check pipe and fi ttings from meter to 
combination gas valve using soap solution or 
other approved methods.
f.  TEST GAS PIPING — Test gas piping and 
connections between combination gas valve and 
manifold, manifold orifi ces, and pilot piping for 
leaks after boiler is operating.  Use soap solution or 
other approved method.
g.  Install enclosure cover and secure with #8 x ½” long 
sheet metal screws.
3
 
OPERATING INSTRUCTIONS - See page 14.
Figure 10
SCHEMATIC PILOT AND GAS PIPING