Lochinvar 2 사용자 설명서
Revision Notes: Revision A (ECO #C07970) initial release.
Revision B (ECO #C08023) reflects changes made to FIG. 6-3 on page
32 for Mass approval and changes made to FIG. 5-3 on page 28.
32 for Mass approval and changes made to FIG. 5-3 on page 28.
Revision C (ECO #C08179) reflects the addition of three (3) new vent
manufacturers (pg. 16 - Table 2A).
manufacturers (pg. 16 - Table 2A).
Revision D (ECO #C08585) reflects edits made to FIG. 4-4 and the
addition of Fixed or Variable Flow Primary in place of Full Flow.
addition of Fixed or Variable Flow Primary in place of Full Flow.
Revision E (ECO #C08841) reflects changes made to #3 on page 42
additional information added to the humidity warning on page 7, along
with references to the Dual Fuel Supplemental Manual.
additional information added to the humidity warning on page 7, along
with references to the Dual Fuel Supplemental Manual.
Revision F (ECO C09629) reflects the update of the AHRI and ASME
logos on page 6 and the update of condensate disposal information and
Figure 8-1 on page 39.
logos on page 6 and the update of condensate disposal information and
Figure 8-1 on page 39.
Revision G (ECO C10325) reflects a kit number correction (Neutralizer
kit) and the addition of version 4, software update (pg. 49).
kit) and the addition of version 4, software update (pg. 49).
Revision H (ECO C10391) reflects the change in Label and Wiring
diagrams on pages 58 and 59.
diagrams on pages 58 and 59.
Revision I (ECO C11129) reflects changes made to the Ratings (page
6), the Common Venting section, page 18 and (ECR 05455) the addition
of #7 in the Before Locating the Boiler section on page 7.
6), the Common Venting section, page 18 and (ECR 05455) the addition
of #7 in the Before Locating the Boiler section on page 7.
FB-I-O Rev I
08/12