ULTRA FLAME DIRECT VENT GAS STOVE 
14 
Direct Vent Kit for Floor Installation 
1.  Move the stove to its position; 
2.  Install temporarily an 8 in. section 
(4) to visualize where the opening 
is to be done thru the wall. Center 
of the opening should be at about 
23 ½‘’ above the base of the stove; 
Note: Horizontal run should have a 
slope of ¼ in per foot. 
3.  Make a 10-1/2" x 10-1/2" opening 
in the wall, 23-1/2" inches in order 
to introduce the radiation shield 
thru the wall; 
4.  Cut the radiation shield to length if 
necessary and install as shown. 
Secure with four #10 x 1” wood 
screws; 
5.  Install the vent terminal (13) with 
2½ screws (12). You may want to 
remove the vent casing for easy 
access and manipulation, Keep 
only in place the wall plate; 
 
Floor Installation Details 
6.  Insert the 8 in. pipe into the round 
opening of the interior black wall 
plate (7). Fix the insulation pad (9) 
around the 8 in. pipe with the 
aluminum tape; 
7.  Keeping the insulation joint of the 
8 in. pipe down, insert it into the 
vent terminal wall plate; 
8.  Secure the 8 in. pipe to vent 
terminal wall plate with the metal 
screw; 
9.  Fix finally the vent terminal wall 
plate with six 2 ½ in screws (12). 
10.  Insert the 4 in. flexible pipe (3) into 
the 8 in. pipe and fix it to the vent 
terminal flange. Use high 
temperature silicone and one 
locking band to secure it in place;  
NOTE: All joints must be sealed with 
RTV silicone, 315
°C. (600°F) 
temperature resistance. 
CUT TO LENGTH
10-1/2" X 10-1/2"
OPENING