Drolet HT-1600 사용자 설명서

다운로드
페이지 28
 
8
AIR TUBES INSTALLATION (HT-2000): 
 
The secondary air tubes are painted different colours . The back tube is yellow, the middle 
on  is  red  and  the  front  is  unpainted.  Before  installing,  make  sure  the  locating  holes  in  the 
tubes (holes near one end of the tube) are on the left side. Insert one tube in the right side 
air  channel  and  slide  it  to  the  right  as  much  as  possible.  Bring  the  left  end  of  the  tube 
aligned with the ring welded to the left air channel. Move the tube to the left until the locating 
holes are aligned with those in the ring. Insert a cutter pin to hold in place. The air injection 
holes should be facing down in the front and middle tubes. 
 
 
 
Figure 4: Air Tubes Installation