Lightolier 1101F Series 사용자 설명서

다운로드
페이지 3
 
 
 
 
 
 
INSTALLATION INSTRUCTIONS FOR STEEL CONSTRUCTION APPLICATIONS 
 
1  PREPARATION: Remove Wing Nuts on T-Bar Clips and reverse clips to inside of Luminaire Frame.  Loosen Wing 
Nuts on Frame Clamps enough to allow free movement of Mounting Bars. Using standard ½” EMT tubing, cut pieces 
to required length such that it spans across Hat Channel. Position EMT across Frame Mounting Bars and loosely 
secure to End Brackets with T-Bar Clips. (Figures A, B, & C) 
 
NOTE: The Mounting Bars may be readily adjusted to fit desired openings between 13” (330mm) minimum and 24” 
(610mm) maximum.   
2  POSITION AND INSTALL LUMINAIRE FRAME: Position Luminaire Frame at approximate location with EMT resting 
on Hat Channel.  Secure EMT to Hat Channel. Adjust frame to final location by sliding along EMT & Mounting Bars. 
Lock the Frame in place by tightening the Wing Nuts on the Frame Clamps and T-Bar Clips. 
 
NOTE: When the Luminaire Frame is to be used with Wall Wash Trims make sure to orient the Luminaire 
Frame side indicated by a label on the frame towards the wall to be illuminated. 
 
 
 
 
Figure A 
 
Figure B
 
 
Figure C 
 
 
 
INSTALLATION PROCEDURE FOR:
  
Lytecaster® 1101F, 1001F and 2001F Series Frame-In Kits
(Continued)
 
INSTRUCTION SHEET NO.
IS:1101F 
D1007 
Page 3 of 3
 COMPANY 
631 Airport Road, Fall River, MA 02720