Dometic 3200 Series 사용자 설명서

다운로드
페이지 12
4
STEP 5a: For through-the-floor water line and electrical 
wires, mark another centerline 6 inches (52 mm) from 
the back wall (fig. 4).
STEP 5b: For through-the-wall water line and electrical 
wires, mark a centerline 8 inches (203 mm) up from the 
floor centerline (fig. 5).
STEP 6: Make a 4-3/4 inch (2 mm) diameter hole (for 
most floor flanges) or a 5-1/8 inch (130 mm) diameter 
hole (for swivel joint floor flange) at the centerline mark 
furthest from the wall. Make a  inch (25 mm) hole at the 
mark closer to the wall for the water line and electrical 
wires (fig. 6).
STEP 7: Insert floor flange into larger hole and secure 
to the floor with #12x3/4-inch long flat head wood or 
sheet metal screws (fig.7). 
fig. 5
fig. 6
fig. 4
IMPoRTANT: The prefered installation method is to 
mount the floor fIange directly on the finished floor. 
However, if the bottom of floor flange and bottom of 
china toilet must be mounted at different heights, 
the floor flange must be mounted within 3/8 inch (10 
mm) of the bottom of the toilet (see illustrations in 
next column) or leakage will result. 
below-floor Installation
STEP  8:  Route  /2-inch  (3mm)  PEX  tubing  through 
the smaller hole and install a PEX 1/2-inch MPT fitting 
(fig. 8). 
NoTe: A water shut-off valve should be installed in the  
water line to the toilet for maintenance requirements. 
fig. 7
Above-floor Installation
Fig. 8