Honeywell SMV 3000 사용자 설명서

다운로드
페이지 217
1/99
SMV 3000 Transmitter User’s Manual
109
9.5
Replacing Meter Body Center Section,  
Continued
Procedure, continued
Table 29
Replacing Meter Body Center Section, Continued
Step
Action
4
Remove nuts from bolts that hold process heads to center section.
Remove process heads and bolts
5
Remove O-ring and clean interior of process head using soft bristle
brush and suitable solvent.
6
Replace O-ring.
7
Coat threads on process head bolts with anti-seize compound such
as “Neverseize” or equivalent.
8
Carefully assemble process heads and bolts to new center section.
Finger tighten nuts.
22370
Nuts
O-ring
O-ring
Bolts
Process 
head
Center 
section
Process 
head
Flex-Tape Assembly
Continued on next page