Lucent Technologies Release 7 사용자 설명서

다운로드
페이지 2657
DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Commands 
8-186
reset system 
8
reset system
reset system [level# | interchange] [disk | tape] [contention-override]
!
CAUTION:
All system resets (except planned interchanges) are service affecting, with 
higher levels being increasingly destructive. Some resets may take up to 
one half hour to complete. Certain conditions may result in a higher reset 
level than the one requested. Unless you are experienced with resetting a 
system, follow normal escalation procedures.
NOTE:
reset system interchange, used to switch control of the system from an 
active SPE to the standby, is discussed separately under its own heading.
This command resets a Switch Processing Element (SPE) at a specified level that 
is increasingly disruptive as the reset level increases. 
All system resets (except 
reset system interchange) are disruptive and terminate the G3-MT login.
When the command is entered, the MSS devices are checked to see if they are 
currently in use. If any command or maintenance process that accesses the MSS 
is in progress, the reset is denied and a message is displayed. In this case, the 
contention-override option is required to force the reset. This check prevents 
aborting of a save translation or other MSS process.
If the vector bit is set to trigger a core dump for the specified reset level, a copy 
of system memory is first written to the primary MSS device. The system then 
clears the vector and proceeds with the request. If the vector is set for an active 
SPE core dump for reset level 1 a reset level 2 will be performed to recover the 
Packet Interface links. See the get vector command.
System software will generally not escalate a demand system reset to a higher 
level. There are certain conditions that result in a higher level reset than that 
requested. These include the following:
The vector is set to trigger a core dump on the active SPE in the event of a 
level 1 reset.
A PNC interchange is already in progress.
A change in translation administration is in progress.
Reset levels greater than 1 turn off shadowing in a duplicated system, and leave 
the standby SPE in an unrefreshed condition for several minutes.