American Standard 3838Y1.SR-NEO.XXX 사용자 설명서

다운로드
페이지 3
7 5 4 2 8 7 - 1 0 0   R e v .   A
- 2 -
INSTALLATION INSTRUCTIONS
STEP 1. PREPARING ALCOVE
•  Strip alcove to bare studs.
•  Shower stud pocket should be constructed as shown above.
•  Floor must be clean, smooth, and level (check with level). Sub floor must be 
installed. Do not install shower base on open floor joists.
•  Cut hole in sub floor as shown on page 1 to accommodate drain.
STEP 2. INSTALLING PAN
•  Trial fit base in prepared alcove. With pan sitting flat on floor, check with level  
on top of pan. Pan should be level from front-to-back and side-to-side (Fig 1).   
If pan is not level, remove pan and level floor using leveling compound.
•  A floor leveling compound (smooth mortar) or a similar quick-setting compound 
specifically made for leveling floors may be used to fully support and level base.
•  After pan is leveled, if alcove is larger than pan, shim between pan and studs to 
create a tight fit. Drill 3/16" holes in pan flange at each stud. Screw pan flange  
to studs (Fig. 2).
CLEANING
•  Do not use any abrasive cleaners or metal scrapers.
•  If drywall mud or plaster gets on your shower, it may be carefully removed     
with a wooden scraper made from a piece of scrap wood.
•  Adhesive may be removed with mineral spirits.
•  Ideal cleaners are Soft Scrub Gel
®
 or Comet Gel
®
.
FIGURE 1. Check to assure pan is level.
FIGURE 2. If necessary, shim between pan and 
studs for tight fit and screw to each stud.
RECOMMENDED TOOLS AND MATERIALS
Tape Measure   
Pencil   
Saber Saw 
 
Screws, 1" Flathead, Stainless 
Safety Glasses   
Drill 
 
24" Level 
 
    
WARNING:  Some cleaning products are not suitable for use. Read all labels carefully.    
                 DO NOT USE if they say “not suitable for use with ABS, acrylic or polystyrene”.
 
 
     IMPORTANT
•  Allow pan to reach room temperature before installation.
•  Before you begin, locate appropriate product reference (see page 1).
•  Read installation instructions carefully before starting project.
•  Keep instructions for warranty information