Generac Power Systems 17 kW LP 사용자 설명서

다운로드
페이지 192
2.  Test for utility source line-to-line voltage across Terminal 
Lugs  N1  and  N2  (see  Figure  1).  Normal  utility  source 
voltage should be indicated.
RESULTS:
1.  If  low  or  no  voltage  is  indicated,  find  the  cause  of  the 
problem and correct.
2.  If  normal  utility  source  voltage  is  indicated,  refer  to 
Flow Chart.
teSt 40 – check Battery charGer 
Supply VoltaGe 
“pre-Wire load center”
DISCUSSION:
The  battery  charger  is  supplied  with  120  VAC.  The 
output of the battery charger is 13.4 VDC / 2.5A.
PROCEDURE:
Refer to Figure 11.
1.  Set VOM to measure AC voltage.
2.  Measure  across  points  A  and  B.    240 VAC  should  be 
measured.
a.  If 240 VAC is not measured, verify load source 
voltage.
b.  If 240 VAC is measured go to Step 3.
3.  Measure  across  points  A  and  C.    240 VAC  should  be 
measured.
a.  If  240 VAC  is  not  measured,  repair  or  replace 
Wire T1.
b.  If 240VAC is measured, proceed to Step 4.
4.  Measure  across  points  A  and  D.    240 VAC  should  be 
measured.
a.  If 240 VAC is not measured, replace fuse F3.
b.  If 240VAC is measured, proceed to Step 5.
5.    Remove  Fuse  F3.  Measure  across  points  D  and  C. 
120 VAC should be measured.
a.  If 120 VAC is not measured, verify neutral wire 
is connected at point E. If good, replace battery 
charger, then retest.
b.  If 120VAC is measured, refer to Flow Chart.
teSt 41 – check Battery charGer 
output VoltaGe 
“pre-Wire load center”
DISCUSSION:
The battery charger is supplied with 120VAC. The out-
put of the battery charger is 13.4 VDC / 2.5A.
PROCEDURE:
Refer to Figure 11.
1.  Set VOM to measure DC voltage.
2.  Remove  Wire  0  and  Wire  15B  from  transfer  switch 
terminal strip points F and G.
3.  Measure across points H and I. Battery supply voltage 
(12 VDC) should be measured.
a.  If battery voltage is not measured, wait 5 minutes 
and repeat Step 3. 
b.  If  battery  supply  voltage  is  still  not  available, 
refer to Flow Chart.
c.  If battery voltage is measured, proceed to Step 4.
4.  Reconnect Wire  0  and Wire  15B  previously  removed 
in Step 2.
5.  Measure  across  points  H  and  I.  13.4 VDC  should 
be measured.
a.  If  13.4  VDC  is  not  measured,  replace  the 
battery charger 
b.  If 13.4 VDC is measured, the charger is working.
*note: Battery charger voltage will be higher than 
battery supply voltage.
teSt 42 – check Wire 0 and Wire15B 
“pre-Wire load center”
DISCUSSION:
In order for the battery charger to function, battery supply 
voltage must be available to the battery charger.
PROCEDURE:
Refer to Figure 11.
1.  Set VOM to measure DC voltage.
2.  Disconnect Wire 0 and Wire 15B from generator terminal 
strips, locations J and K.
3.  Wait five (5) minutes after removing wires.
4.  Measure  across  points  L  and  M  on  the  terminal  strip. 
12 VDC should be measured.
a.  If 12 VDC is measured, proceed to Step 6.
b.  If 12 VDC is not measured, proceed to Step 5.
5.  Measure  across  points  M  and  N.  12 VDC  should  be 
measured.
a.  If  12 VDC  is  measured,  repair  or  replace Wire 
0  between  the  generator  terminal  strip  and  the 
ground lug.
b.  If 12 VDC is not measured, proceed to Step 8.
6.  Set VOM to measure resistance.
7.  Connect the meter test leads across the disconnected 
Wire 0 and Wire 15B. Approximately 115 Ohms should 
be measured.
Part 3
TRANSFER SWITCH
sEctioN 3.4
DiaGNostic tEsts
Page 86