3.  Measure  across  points  G  and  H  on  the  terminal  strip. 
12VDC should be measured.
a.  If  12 VDC  is  measured,  the  charger  should  be 
functioning.
b.  If 12 VDC is not measured, proceed to Step 4.
4.  Remove Wire  0  and Wire  15B  from  generator  terminal 
strip locations E and F.
5.  Wait five (5) minutes after removing wires.
6.  Measure  across  points  E  and  F  on  the  terminal  strip. 
12 VDC should be measured.
a.  If 12 VDC is measured, proceed to Step 8.
b.  If 12 VDC is not measured, proceed to Step 7.
7.  Measure across point H and ground lug. 12 VDC should 
be measured.
a.  If  12 VDC  is  measured,  repair  or  replace Wire 
0  between  the  generator  terminal  strip  and  the 
ground lug.
b.  If 12 VDC is not measured, proceed to Step 8.
8.  Set VOM to measure resistance.
9.  Connect the meter test leads across the disconnected 
Wire 0 and Wire 15B. Approximately 200 Ohms should 
be measured.
a.  If 200 Ohms is measured, proceed to Step 11. 
b.  If zero resistance or CONTINUITY is measured, 
connect  the  meter  test  leads  across  BAT-  and 
XFER on the load center motor.
c.  If  zero  resistance  is  measured,  a  short  exists. 
Replace the load center motor.
d.  If  200  Ohms  to  INFINITY  is  measured,  repair 
or replace Wire 15B between the generator and 
the load center.
10. Disconnect the J2 connector from the printed circuit board.
11. Measure across point M and pin location J2-8 of the 
connector  just  removed.  CONTINUITY  should  be 
measured.
a.  If  CONTINUITY  is  not  measured,  repair  or 
replace  Wire  15B  between  the  J2  connector 
and the terminal strip.
b.  If  CONTINUITY  is  measured  and  the  pin  con-
nection looks good, the internal fuse on the PCB 
has failed. Replace the printed circuit board.
teSt 49 – check Battery charGer 
Supply VoltaGe 
“load Shed tranSFer SWitch”
DISCUSSION:
The  battery  charger  is  supplied  with  120  VAC.  The 
output of the battery charger is 13.4 VDC/2.5A.
PROCEDURE:
Refer to Figure 14.
1.  Set VOM to measure AC voltage.
2.  Measure  across  points  A  and  B.  240 VAC  should  be 
measured.
a.  If 240 VAC is not measured, verify load source 
voltage at ATS.
b.  If 240 VAC is measured, proceed to Step 3.
3.  Measure  across  points  A  and  C.  240 VAC  should  be 
measured.
a.  If  240 VAC  is  not  measured,  repair  or  replace 
Wire T1  between  LSS  and  J3  terminal  of  load 
shed controller.
b.  If 240VAC is measured, proceed to Step 4.
4.  Measure  across  points  C  and  D.  120 VAC  should  be 
measured. 
a.  If  120 VAC  is  not  measured,  repair  or  replace 
Wire 00 between J3 terminal and neutral block 
(NB).
b.  If 120 VAC is measured, proceed to Step 5.
5.  Measure  across  points  E  and  D.  120 VAC  should  be 
measured.
a.  If 120 VAC is not measured, replace fuse F3 on 
load shed controller.
b.  If 120 VAC is measured, proceed to Step 6.
6.  Measure  across  points  E  and  F.  120 VAC  should  be 
measured.
a.  If 120 VAC is not measured, replace load shed 
controller.
b.  If 120 VAC is measured, refer to Flow Chart.
teSt 50 – check Battery charGer 
output VoltaGe 
“load Shed tranSFer SWitch”
DISCUSSION:
The  battery  charger  is  supplied  with  120  VAC.  The 
output of the battery charger is 13.4 VDC/2.5A.
PROCEDURE:
Refer to Figure 14.
1.  Set VOM to measure DC voltage.
2.  Remove and isolate battery charger black and red leads 
from generator terminal strip points G and H.
3.  Measure across points G and H. Battery supply voltage 
(12 VDC) should be measured.
a.  If  battery  voltage  is  not  measured,  wait  5  min-
utes and repeat Step 3. If battery supply voltage 
is still not available, refer to Flow Chart.
b.  If battery voltage is measured, proceed to Step 4.
Page 92
Part 3
TRANSFER SWITCH
sEctioN 3.4
DiaGNostic tEsts