TC12 Installation, Commissioning & Maintenance Handbook 
2.3 
2.3.1 Safety Tests on the TC12 Instation 
2.3.1
ark
ilar capable of 1000 V). 
CD Tester (e.g. Seaward RC500). 
2.3.1
afet
 to 
ment - 
2.3.1.3 Pre-test 
C
escription of 
rry out a visual inspection to check 
p firmly. 
2.3.1
2.3.1
2.3.1
to the Earth wire of the Instation 
ry 
 
COMMISSIONING 
 
.1  Test Equipment Required 
Multimeter (e.g. Fluke 77 or similar). 
 
Com
 Insulation Meter 1905 (or sim
 
Clare R133R10 Earth Continuity Tester (or similar). 
 
R
 
.2 S
y Considerations 
Statutory and Company legislation relating to safety must be followed. During 
testing hazardous voltages will be present, only qualified personnel are allowed
operate the equipment with hazardous voltages present. 
 
ELECTRIC SHOCK RISK - hazardous voltages are present within the equip
observe any warning labels and do not remove any protective covers. 
 
Inspection 
heck that the correct fuses are fitted to the Instation (see section 2.4.9 for a 
fuses fitted to the Instation). Ca
d
all earth connections are made and that the associated screws are done u
Check that the mains cables are plugged into each PSU PCB and PC used. 
 
.4  Outline of Tests to be Performed 
he sequence of tests will be: 
T
 
(1) 
 
Earth Continuity Check 
2) 
 
Insulation Check (1000 V DC Test) 
(
(3)   RCD 
Test. 
 
.5 Earth Continuity/Insulation Resistance Test Set Up 
The Instation is disconnected from the mains during these tests. 
 
.6  Earth Continuity Test Procedure 
Connect one probe of the Earth Continuity Tester 
mains cable. Connect the other probe to the following points (it may be necessa
to find a suitable place to test without paint) and make sure the reading is below
0.5 Ohms: 
abinet Uprights 
C
666/HE/43100/000  
Page 44 
Issue 9