TC12 Installation, Commissioning & Maintenance Handbook 
PCB Mounting plate 
PCB Frame 
R
e
ack Cross m mbers 
ack Side pl e 
 supply 
R
at
Case of power
ower supply 0 V (pin 4 on OTU PSU 14-way connector, see Figure 18)
 that may have been attached to the 
3.3.1.7
Personnel 
 
ake sure that
ation is not connected to the mains but that all fuses are 
 place and that
co
Make sure that the Outstation mains plug 
socket. 
Set the insulation meter to 1000 V DC. 
Connect the LIVE
P
All earthed points on any other equipment
OTU mechanics. 
 
  Insulation Resistance Test Procedure 
Safety Note 
should take care that they do not come into contact with the high 
voltages generated by the Test Instrument. 
 the Outst
M
in
 the PCB is 
nnected. 
is fully pushed into the Outstation mains 
 an
EUTRAL
d N
 of the Outstation mains wire together. 
Connect the meter to measure between the Outstation mains wire EARTH and the 
combined LIVE and NEUTRAL. 
 
Allow the meter readi
 to settle during the tes
he insulation resistance should be not less than 10 MOhm. 
3.3.2
C
e
 
Note:  If the s
positio
switch
back up again. 
 
Configure the Outstation using a handset terminal connected to the 25-way 'D' 
type connector, SK1, on the PCB. See section 3.3.3 for an explanation of 
commands that need to be entered. 
 
If required the wiring of OTU inputs and outputs (cable 667/1/22693/000) can be 
checked as follows:  
 
Checking OTU Output wiring: 
Attach a handset to the controller and enter controller handset commands 
that display the status of the 16 controller inputs. Attach a handset to the 
OTU and enter handset commands to set different output bit patterns on the 
OTU outputs. Ensure that the controller inputs displayed on the handset 
ng
t. 
 
T
 
  Commissioning Procedure after Power Up 
heck that th  power LED (LP7) comes on when the Outstation is powered up. 
ystem fault LED lights on power up (see section 3.4.1 for LED 
ns) then switch the Outstation off. Make sure the lithium battery 
 on the PCB is in the on position and then power the Outstation 
666/HE/43100/000  
Page 87 
Issue 9