Cisco Systems NPE-225 사용자 설명서

다운로드
페이지 226
 
7-31
Network Processing Engine and Network Services Engine Installation and Configuration
OL-4448-12
Chapter 7      NPE-G1 and NPE-G2 Installation and Configuration Information
Installing the NPE-G1 or NPE-G2
Step 1
Loosen the left and right captive installation screws on the NPE-G1 or NPE-G2.
Step 2
Hold the cable-management bracket so that it is positioned above the NPE-G1 or NPE-G2 captive 
installation screws as shown in 
. The bracket is properly positioned when 
the horizontally-faced notch is at the left, the vertically-faced notch is at the right, and the bracket’s outer 
edge is flush with the edge on the NPE-G1 or NPE-G2. If you reverse the bracket so that it is not flush 
with the NPE-G1 or NPE-G2, you will not be able to access the GBIC or SFP module connectors on the 
NPE-G1 or NPE-G2 front panel. 
Step 3
Slide the left end of the bracket between the captive installation screw and the front panel of the NPE-G1 
or NPE-G2. 
Step 4
Rotate the cable-management bracket down, until its other notch slides behind the right captive 
installation screw. Make sure the bracket’s outer edge is flush with the edge of the NPE-G1 or NPE-G2 
and does not obstruct the GBIC or SFP ports. 
Step 5
Tighten both captive installation screws.
Step 6
Install the cables, and fasten them to the bracket with the velcro straps provided.
Installing the Rear Cable-Management Brackets on a Front-Mounted Router (Optional)
Use the instructions in this section to attach the cable-management brackets to a front-mounted 
Cisco 7200 VXR router.