Cisco Systems NPE-225 사용자 설명서

다운로드
페이지 226
 
7-35
Network Processing Engine and Network Services Engine Installation and Configuration
OL-4448-12
Chapter 7      NPE-G1 and NPE-G2 Installation and Configuration Information
Installing the NPE-G1 or NPE-G2
Figure 7-23
Installing the Chassis in a Telco-Type Rack with an Installed Cable-Management 
Bracket
Reconnecting Input Power and Powering Up the Router
The following procedures explain how to reconnect input power to a Cisco 7200 VXR router, Cisco 
UBR7225VXR, or Cisco uBR7246VXR router, power up the router, and verify a successful system boot.
Warning
Read the installation instructions before you connect the system to its power source. Statement 10
Reconnecting AC-Input Power to the Cisco 7200 VXR Router
To reconnect AC-input power to a Cisco 7200 VXR router, complete the following steps:
Step 1
At the rear of the router, check that the power switch on the power supply is in the off (O) position.
Step 2
Slide the cable-retention clip up away from the AC receptacle, and plug in the power cable.
Step 3
Secure the cable in the power supply AC receptacle by sliding the cable-retention clip down until it snaps 
around the connector. The cable-retention clip provides strain relief for the AC power cable. 
1
Rack-mount bracket
2
Cable-management bracket
93812
1
2