Panasonic WJ-GXD900 사용자 설명서

다운로드
페이지 119
28
Rack Mounting
The encoder and the decoder can be installed in the following
racks.
• Racks equivalent to EIA standard: Type 19" EIA standard
(depth: more than 450 mm (17-11/16"))
Important
• Do not install the encoder and the decoder above an appliance which generates heat such a power amplifier. When
installing the encoder and the decoder below a heat-generating appliance, install them below the appliance with a
space equivalent to about 1 unit separating them.
• Keep the temperature in the rack below +45 °C (113 °F).
• When the rack is in a place subject to vibrations, fix the rear of the encoder and the decoder with reinforcing
brackets (not included) 
• Fix the provided tapping screws into screw holes of the rack that have never been threaded before. When screwing
a tapping screw into a threaded screw hole, thread ridge of the screw hole may be damaged.
Mounting the decoder
1. Remove the four rubber feet by removing the four
screws from the bottom of the decoder.
2. Place the supplied rack mounting brackets on both sides
of the decoder and tighten with the four supplied screws
(M3x8).
3. Install the decoder with the rack mounting brackets in
the rack by using four screws (not included).
A device that generates heat 
such as a power amplifier
This unit
Blank panel (1U)
This unit
Rubber feet
Top
Fixing screws
(M3x8) (supplied)
Rack mounting brackets
(supplied)
Fixing screws (M3x8)
(supplied)
Rack mounting screws
INSTALLATIONS
INSTALLATIONS