Removal and Replacement Procedures - Safety Considerations - PLAN AHEAD! 
Revision 5 
  HC900 Hybrid Controller Installation and User Guide 
149 
9/03  
Replacing the Scanner Module 
Removing and replacing the Scanner Module from an I/O expansion rack(C50 CPU only) requires that the 
source of AC power is removed from the rack.  Removing power from the Expansion rack has the 
following consequences: 
• 
All power to all I/O modules in the rack will be lost; hence all control outputs from the rack to the 
process are lost. 
Table 33 - Scanner Module Replacement 
Step Action 
1. 
If a process is currently in operation, then: 
Either: 
- Ensure that powering-down the expansion rack will not have adverse consequences on any 
running process.   
Or:  
 - Bring the process to a safe and orderly shutdown. 
2. 
Using an external (user-supplied) switch, disconnect the power supply in the expansion rack 
from the site AC power source.  
3. 
Unplug the 10Base-T cable from the scanner. 
4.  
At the top and bottom of the Scanner Module, loosen the captured screws that secure the module 
in the rack, and remove the module from the rack.  
5. 
Configure the scanner address jumpers on the replacement module to match those of the removed 
module. 
6. 
Ensure that the new Scanner Module is properly aligned with the slot guides, insert the new 
Scanner Module in the rack, and secure it in place with the captured screws at top and bottom of 
the module. 
7. 
Re-install the 10Base-T cable. 
8. 
Using the external (user-supplied) switch, connect the power supply in the expansion rack to the 
site AC power source.  The Scanner Module should resume communications with I/O modules in 
the rack and with the Controller Module with which it is connected. 
9. 
Check status indications at the Scanner Module, at the Controller Module, and at the OI.