Honeywell HC900 사용자 설명서
Installation Guide - Overview
52
HC900 Hybrid Controller Installation and User Guide
Revision 5
9/03
Table 11 - Install HC900 Controller Components
Step Procedure
Comments/References
Mount the Controller Rack
in the enclosure as follows.
in the enclosure as follows.
•
Using the diagram
below as a guide, mark
the locations for rack
mounting in the
enclosure for the top
holes in the rack.
(See CAUTION and
Note at right.)
below as a guide, mark
the locations for rack
mounting in the
enclosure for the top
holes in the rack.
(See CAUTION and
Note at right.)
•
Drill and tap for # 10 (or
M4) screws.
M4) screws.
•
Start the mounting
screws (supplied by the
user) in the drilled
holes.
screws (supplied by the
user) in the drilled
holes.
•
Hang the Rack on the
screws at the top.
screws at the top.
•
Mark the locations for
the bottom screws.
(See CAUTION at
right.)
the bottom screws.
(See CAUTION at
right.)
•
Drill and tap for # 10 (or
M4) screws.
M4) screws.
•
Remove the rack from
the enclosure.
the enclosure.
For dimensions of the pattern for drilling holes, refer to the
diagram below.
diagram below.
CAUTION:
When drilling holes, prevent metal flakes from falling into
the rack, or onto any surface within the electrical cabinet.
the rack, or onto any surface within the electrical cabinet.
Note: Always mount racks as shown above. That is, never
mount vertically, or with backplane horizontal.
mount vertically, or with backplane horizontal.
1