5. Confirming Operation
5-1 Flow of Onsite Adjustments
……
……
……
Test run by unit and local remote controller 
Refer to 5-4 (1)
Test run by LM ADAPTER 
Refer to 5-4 (2)
Test run from the L
ON
W
ORKS
®
 
network
Refer to 5-4 (3)
There are the following two methods to perform a test run from the L
ON
W
ORKS
®
 network.
Test run by L
ON
W
ORKS
®
 tools
If the bindings to other machines have not been performed, use the L
ON
W
ORKS
®
 tools as described by the procedure 
given in 5-4 (3) and confirm that operation can be performed from a  L
ON
W
ORKS
®
 network.
 Test run from building management system
If the bindings to other machines have been performed, or if you do not have the L
ON
W
ORKS
®
 tools, follow the building 
management system test run procedure to confirm that operation can be performed from the  L
ON
W
ORKS
®
 network.
5-2 Preparation Material for Onsite Adjustments
(1) Preparation material for onsite adjustment
Tester
Onsite adjustment tools (L
ON
W
ORKS
®
 tools, M-NET onsite adjustment tools)
* L
ON
W
ORKS
®
 tools
The L
ON
W
ORKS
®
 tools are listed below. Contact your dealer for more information.
• L
ON
W
ORKS
®
 network interface (PCC-10 PC card etc.)
• Cables for the above interface
• nodeutil (Free software from Echelon)
(2) Reference materials
LM ADAPTER Installation Manual
LM ADAPTER Network Variable Specifications
5-3 Preparation and Settings
(1) Perform the previous operations described in Chapter 3 “Installation” ,Chapter 4 “System Settings”.
(2)If being used together with system controller, perform the installation and electrical installation for system controller.
(3) Perform the initial processing for the LM ADAPTER.
 Turn on the power supply for LM ADAPTER.
If being used together with system controller, perform the initialization settings.
The units will be idle until the LM ADAPTER initialization has been completed (LED002 goes out).
* This requires approximately 5 to 10 minutes.(If being used together with system controller, it will be approximately
 3 minutes after the completion of the initialization settings.) 
 If you connect the power to the LM ADAPTER before connecting the power supply to the units, the LED002 might stay lit. 
 If this case arises, reset the power supply to the LM ADAPTER.
Confirm that the LM ADAPTER’S maintenance LED (LED003, 004) are not lit.
* If the LM ADAPTER’S maintenance LED (LED003, 004) are lit, refer to the next chapter “6. Troubleshooting”.
(Note 1) Always refer to the previous chapter “4. System settings” before changing the system configuration,
              such as the M-NET address.
              
* After confirming the above details, always refer to the following section “ 5-4 Test Run ” and make confirmations
                with trial operations.
(Note 2) Turn all of the switches in the service switch (SW2) [OFF] to confirm the ON/OFF status of the above maintenance
              LED (LED002, LED003 and LED004).
(4) After confirming the above, always perform the test run as described in the next section “5-4. Test Run”.