Adtran 1204002L1 사용자 설명서

다운로드
페이지 163
48
IQ Probe User Manual
61200214L1-1
Chapter 6.  DTE Port Configuration
Follows Network (FOLLOW NET)
If ENABLED, PVC signaling responses are sent to the router
only when the network signaling state is up.  Enable this option
when the router is going to use an alternate path for dial backup.