Avaya CMC1 사용자 설명서

다운로드
페이지 370
Activate and Administer the System
Issue 10 June 2005
77
 
Activate and Administer the System
Note:
Note:
The Avaya CMC1 Media Gateway is a PPN cabinet only. Cabinet A is the control 
carrier and Cabinets B and C are port carriers.
Power Up System
Single Cabinet Installations
To power up a single cabinet system:
1. Insert the translation card into the slot in the TN2402 Processor circuit pack.
2. Fully seat the 650A Power Unit in the cabinet.
3. Set the circuit breaker at the AC load center to ON. This starts the system reboot process. 
In about 2 minutes, verify the screen displays:
 Login:
 
Multi-Cabinet Installations
To power up a multi-cabinet system:
1. Insert the translation card into the slot in the TN2402 Processor circuit pack.
Note:
Note:
Power up the port carriers first and the control carrier last. 
2. Set the circuit breakers at the AC load center to ON. 
3. Insert the power supplies into the port cabinets.
4. Insert the power supply into the control carrier. This starts the system reboot process. In 
about 2 minutes, verify the terminal screen displays: 
Login:
Deliver or Install the License File
To deliver or install the license file:
If you have a direct switch connection:
1. Go to the RFA website, and, following the instructions in the “Deliver to G3r/G3si/G3csi” 
chapter of the RFA Job Aid, deliver the License File.