Paradyne 8747 사용자 설명서
Testing
8-10
8700-A2-GB20-00
April 2000
Ending an Active Test
Except for the Remote Send Line Loopback and Remote DCLB, a test initiated by
the user can be ended by the user. Tests can also be terminated automatically by
enabling the Test Timeout option from the System Options Menu.
the user can be ended by the user. Tests can also be terminated automatically by
enabling the Test Timeout option from the System Options Menu.
H
A Test Timeout option is available to automatically terminate a user-initiated
Loopback or Pattern test (as opposed to manually terminating a test) after it
has been running a specified period of time. The default is 10 minutes.
Refer to Table A-7,
Loopback or Pattern test (as opposed to manually terminating a test) after it
has been running a specified period of time. The default is 10 minutes.
Refer to Table A-7,
H
On each test screen is a Command column. To manually stop the test, press
Enter when the cursor is on the Stop command.
Enter when the cursor is on the Stop command.
H
Use the Abort All Tests selection from the Test menu to stop all tests running
on all interfaces, with the exception of network-initiated loopbacks.
on all interfaces, with the exception of network-initiated loopbacks.
Command
Complete
appears when all tests on all interfaces have been terminated.
An aborted test may continue to run for a few seconds as the abort command
is sent to the remote end and processed.
is sent to the remote end and processed.