Epson 7000 사용자 설명서

다운로드
페이지 231
EPSON Stylus Pro 7000
Revision B
Disassembly & Assembly
Disassembly Flow
132
4.2.3.4  Removing the CR Board Assembly
1.
Remove the R Side Cover as described in “R Side Cover Removal” on 
page 114.
2.
3.
Remove the I/C Holder Cover as described in “I/C Holder Cover Removal” 
on page 116.
4.
5.
Remove three screws (CPPM3x6) securing the CR board, and remove one 
screw (CP(W)M3x6) securing the ground line, washer (M3), and CR board 
guide.
Figure 4-38.  CR Board Guide Removal
6.
While holding down the CR Board (left edge), remove two FFC cables 
from the FFC lock-type connectors.
Figure 4-39.  CR Board FFC Removal
7.
While holding down the CR Board (left edge), remove three connectors 
from the CR Board.
Figure 4-40.  Connector and CR Board Removal
8.
Remove two screws (CPP M3x8), then remove the CR Board.
You may find it helpful to manually release the Carriage Lock 
by pushing down the cutter and move the carriage away from 
the capping position.
CR board guide
Screw, 
ground 
line, and 
washer
Three screws
FFC to Main Board
FFC to printheads
CR Board
Connector (white, 
to CR encoder)
Connector (black, to 
P_Edge sensor)
Connector (white, to 
cutter solenoid)
Two 
screws
Ground, 
washer
CR Board