Epson 7000 사용자 설명서

다운로드
페이지 231
EPSON Stylus Pro 7000
Revision B
Adjustment
Mechanism Adjustment
198
CR TIMING BELT TENSION ADJUSTMENT
This adjustment is necessary for service operations that require you to 
remove/loosen the CR Motor or CR Steel Belt. When replacing or re-installing 
the CR Steel Belt, you need to confirm the tension of the CR Steel Belt. 
Tighten or loosen the screws on the Driven Pulley to increase or decrease the 
tension.
Standard:
8000g ± 10% (at the point where the CR Steel Belt 
contacts the CR Rail)
Figure 5-44.  CR Timing Belt Tension Adjustment
PF TIMING BELT TENSION ADJUSTMENT
This adjustment is necessary for service operations that require you to 
remove/loosen the PF Motor or PF Belt. When replacing or re-installing the PF 
Belt, you need to confirm the tension of the PF Belt.
Standard:
2,200g ± 10%
Figure 5-45.  PF Belt Tension
CR Tension Bracket
CR 
Timing 
Belt
CR 
Tension 
Screw
Hook the tension gauge here and 
pull directly to the right, parallel to 
the timing belt. Fix the screw at a 
tension of 8000g ± 10%.
1) Insert the Tension 
Gauge hook in the PF 
Motor holder hole
2) Pull directly away 
from the PF Belt until 
the tension gauge 
reads 2200g ± 10%
3) Secure the screws