Siemens PCIL43 사용자 설명서

다운로드
페이지 112
 
SIMATIC Rack PC IL 43 
Operating Instructions, Edition 09/2005, A5E00432875-01 
4-1
 
Deployment planning 
4
4.1 
4.1 
Transport 
Although the Rack PC has a rugged design, its internal components are sensitive to severe 
vibrations or shock. You must therefore protect the PC from severe mechanical stress when 
transporting it. 
You should always use the original packaging for shipment of the device. 
 
 
Caution 
Risk of damage to the device! 
When transporting the PC in cold weather it may be submitted to extreme variations in 
temperature. In this situation, make sure that condensation does not develop on or inside 
the device. 
If condensation develops, wait at least 12 hours before switching on the device. 
4.2 
4.2 
Unpacking and checking the delivery unit 
Unpacking the device 
Note the following points when you unpack the unit 
• 
It is advisable not to dispose of the original packing material. Keep it in case you have to 
transport the unit again. 
• 
Please keep the documentation in a safe place. It is required for initial commissioning and 
is part of the device. 
• 
Check the delivery unit for any visible transport damage. 
• 
Verify that the shipment contains the complete unit and your separately ordered 
accessories. 
• 
Please inform your local dealer of any disagreements or transport damages. 
• 
Please inform Siemens AG by means of the enclosed SIMATIC IPC/PG quality control 
report form.