American Power Conversion AIS 5000 사용자 설명서
External Connection - Connecting the UPS
990-2440
AIS 5000 400V Installation Manual
15
5. Install Conduit Box under UPS. Push projecting edge of Conduit Box into slot on UPS bottom
plate. From inside the UPS, mount front of Conduit Box onto UPS bottom plate using 2 M4×12
cross head screws for 10–30 kVA and 3 M4×12 cross head screws for 40–100 kVA.
cross head screws for 10–30 kVA and 3 M4×12 cross head screws for 40–100 kVA.
6. Mount conduits.
7. Feed cables.
8. Install cables according to the procedures described in the following sections.
Access to Input/Output section
To access cable terminals, open front door, remove screws and lift off front cover (remember earth
wire on rear side).
wire on rear side).
Remember to remount front cover (and earth wire) before system start-up.
Caution
CAUTION!
Ensure correct phase rotation of utility input voltage! Max. power cable size: see section
with technical specifications starting on page 24.
Ensure correct phase rotation of utility input voltage! Max. power cable size: see section
with technical specifications starting on page 24.