Powerware 208/120V 사용자 설명서

다운로드
페이지 72
OPERATION
EATON Powerware
®
 Energy Management System (EMS) Upgrade Kit User’s Guide  
S
  164201724 Rev 1
 www.powerware.com
47
6.
When the individual circuit configuration is complete, select OK to
return to the PANEL SCHEDULE screen to configure the next
breaker.
7.
When all branch circuit configuration is complete, select the
 button repeatedly to reach the main menu.
8.
If all configuration is complete, save your changes by pressing the
Reset button on the Power Xpert Gateway Card in the X−Slot
communication bay. (The card automatically resets after five
minutes.)
To remove a breaker from the panel:
1.
If not already obtained, access the System Setup Level 1 password
level. See Accessing Configuration" on page 43.
2.
From the main menu, select METER then PANEL.
3.
Highlight the panel number (PNL), and then select SCHEDULE.
4.
Highlight the breaker to remove, and then select BREAKER and
DELETE.
5.
Select the 
 button repeatedly to reach the main menu.
6.
If all configuration is complete, save your changes by pressing the
Reset button on the Power Xpert Gateway Card in the X−Slot
communication bay. (The card automatically resets after five
minutes.)
To change a breaker’s settings:
1.
If not already obtained, access the System Setup Level 1 password
level. See Accessing Configuration" on page 43.
2.
Follow the steps to remove a breaker from the panel.
3.
Follow the steps to configure a breaker.