Juniper Networks EX8208 사용자 설명서

다운로드
페이지 338
CHAPTER 4
Site Preparation
Site Preparation Checklist for an EX8200 Switch
The checklist in Table 36 on page 91 summarizes the tasks you need to perform to prepare
a site for installing an EX8200 switch.
Table 36: Site Preparation Checklist
Date
Performed By
For More Information
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed switch
tolerances.
Power
Measure distance between external power
sources and switch installation site.
91
Copyright © 2010, Juniper Networks, Inc.