 20 
Section 4 — Maintenance
40kW Liquid-cooled Generators
4.7 SCHEDULED 
MAINTENANCE
Following is a recommended maintenance schedule for QuietSource small standby and residential generator sets. 
The established intervals in the schedule are the maximum recommended when the unit is used in an average 
service application. They will need to be decreased (performed more frequently) if the unit is used in a severe 
application. Use calendar time from the previous maintenance interval to determine the next required maintenance 
interval.
Service Maintenance Interval Information:
The various service maintenance intervals are designated by interval numbers as follows:
1   An early inspection of the generator set to ensure it is ready to operate when required and to identify any poten-
tial problem areas.
   Performed monthly, this procedure requires approximately .5 man-hours per unit to complete.
 
 This inspection may be performed by the end user providing the following safety steps are taken to prevent 
the engine from starting automatically without warning:
  To prevent injury, perform the following steps in the order indicated before starting any maintenance:
 •  
Disable the generator set from starting and/or connecting to the load by setting the control panel AUTO/
OFF/MANUAL switch to the “OFF” position.
  •  Remove the control panel fuse.
  •  Turn off the battery charger.
  •  Remove the negative battery cable.
  The battery charger must be turned off BEFORE removing the battery cable to prevent an over current condition 
from burning out sensitive control panel components and circuits.
  Following all maintenance, reverse these steps to insure the unit is returned to standby setup for normal  
  operation when required.
2   A break-in service inspection of the generator set to ensure it is ready to operate and carry the load when 
required, and to identify any potential problem areas.
   Performed  ONLY ONCE following the first three months after purchase of the unit and requires approxi-
mately 2.5 man-hours per unit to complete.
 
 This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge 
to accomplish and should be performed only by an Authorized Service Dealer.
3   An operational inspection of the generator set to ensure it is ready to operate and carry the load when required, 
and to identify any potential problem areas.
   Performed semi-annually, this procedure requires approximately 1.5 man-hours per unit to complete.
 
 This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge 
to accomplish and should be performed only by an Authorized Service Dealer.
4   A mid-level inspection of the generator set to ensure it is ready to operate and carry the load when required, 
and to identify any potential problem areas.
   Performed annually, this procedure requires approximately 4.0 man-hours per unit to complete.
 
 This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge 
to accomplish and should be performed only by an Authorized Service Dealer.
NOTE:
If the generator experiences heavy use, the maintenance intervals should be reduced so that procedures are 
performed more frequently.