Q-Logic 5800V SERIES 사용자 설명서
3
Quick Start Guide
Installation Instructions
Congratulations on your purchase of the SANbox
®
5800V Series Stackable Fibre Channel Switch. This guide describes
the steps to install and activate your new switch using a Windows
®
workstation. For advanced options and instructions
(including Solaris
®
, Linux
®
, and Mac OS X
®
installations), refer to the SANbox 5800V Series Stackable Fibre Channel
Switch Installation Guide, which is available at
.
NOTE:
Do not apply power to the switch until instructed in Step 5.
Step 1. Verify the Package Contents
The SANbox 5800V Series Fibre Channel Switch is shipped with the following items:
1
SANbox 5800V Series Stackable Fibre Channel Switch
1
AC Power cord (5800V)
2
AC Power cords (5802V)
4
Rubber feet
1
Enterprise Fabric Suite 2007 CD (free 30-day trial)
Depending on which SANbox 5800V switch you ordered, it may also include Small Form-factor Pluggable (SFP)
transceivers and/or XPAK switch stacking cables. XPAK switch stacking cables connect SANbox 5800V Series switches
together through the XPAK ports.
transceivers and/or XPAK switch stacking cables. XPAK switch stacking cables connect SANbox 5800V Series switches
together through the XPAK ports.
NOTE:
If you ordered SFPs and XPAK switch stacking cables separately, they will arrive in a different package. XPAK
switch stacking cables connect SANbox 5800V Series switches together through the XPAK ports.
Step 2. Mount the Switch
❑
For a surface mount, attach the rubber feet to the locations on the bottom of the switch. For a rack mount, install
the SANbox 3000/5000 series rail kit and the switch in a standard 19" rack as described in the SANbox 3000/5000
Series Fibre Channel Switch Rack Mounting Guide.
the SANbox 3000/5000 series rail kit and the switch in a standard 19" rack as described in the SANbox 3000/5000
Series Fibre Channel Switch Rack Mounting Guide.