Panasonic 1200N 사용자 설명서
Power Unit Installation
Modifications
10-4
Centillion 1200N ATM Switch User Manual
NTP 297-8103-903
Power Unit Installation
This section describes the procedures for installing the power unit.
Inserting the
Power Unit
Power Unit
1.
Make sure the power switch of the power unit that is inserted is turned off.
2.
Remove the front cover from the front of the main unit. Refer to
Figure 10-5: Removing the Front Cover
3.
Insert the power unit into the power unit slot. As the power unit can be made
redundant, there are two slots, left and right. When using only one power unit,
insert the power unit into the slot #0 that is on the left-hand side facing the
main unit. When inserting the power unit, make sure you securely hold the
power unit with both hands (as shown in
redundant, there are two slots, left and right. When using only one power unit,
insert the power unit into the slot #0 that is on the left-hand side facing the
main unit. When inserting the power unit, make sure you securely hold the
power unit with both hands (as shown in
)and insert it all the way
in until it is secure.